142144We get a new shower!!!  Thanks to Logan, Brandon and even Baylor, walls were smashed down and new wall were about to be made.  The old shower had to be cut in two pieces to fit out the door.   146147151152153154We took everything out the back door into the trailer.   Just as we began to open the ceiling up to raise the shower, the weather turned freezing.   The framers were very cold and the room was soooooo frigid.  Burrrrrrrrrrr    155168171By the end of the week walls and ceiling were up and the room and the weather became warmer.    172174